USS Nautilus (SSN-571) was the first nuclear-powered submarine and the first submarine to complete a submerged transit of the North Pole, on 3 August 1958. Authorised in 1951, she was built by the Electric Boat Division of General Dynamics in Groton, Connecticut, launched in January 1954 with Mamie Eisenhower as sponsor, and commissioned into the United States Navy on 30 September 1954. Her pressurised-water S2W reactor, developed under Captain Hyman G. Rickover, let her stay submerged far longer than diesel-electric boats, and she broke many records in her early years. Operation also revealed design limits that improved later submarines. She was decommissioned in 1980, named a National Historic Landmark in 1982 and is now a museum ship at the Submarine Force Library and Museum in Groton.
Facts
Connections
Of Make
Source USS Nautilus (SSN-571) (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source USS Nautilus (SSN-571) (Wikipedia)Lead, manufacturerQuote, Lead, manufacturer
Electric Boat Division in Groton, Connecticut
Originated In
Also in Geography Atlas: where this subject originated.
Source USS Nautilus (SSN-571) (Wikipedia)Lead, country of originQuote, Lead, country of origin
commissioned the following September into the United States Navy
Sources
1. USS Nautilus (SSN-571) (Wikipedia)
Lead
Nautilus was commissioned on 30 September 1954
Lead, status
Nautilus was decommissioned in 1980
Lead, body style
nuclear-powered submarine
Lead, propulsion
Her nuclear propulsion allowed her to remain submerged
Lead, manufacturer
Electric Boat Division in Groton, Connecticut
Lead, country of origin
commissioned the following September into the United States Navy
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.