Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

USS Narwhal (SSN-671)

Marine Vehicles

USS Narwhal (SSN-671) was a one-off nuclear attack submarine of the United States Navy, built to project SCB 245 as a class of her own. The Electric Boat Division of General Dynamics laid her down on 17 January 1966 at Groton, Connecticut; she was launched on 9 September 1967 and commissioned on 12 July 1969. Forward of the reactor compartment she resembled the Sturgeon-class boats, but her natural circulation S5G reactor and large direct-drive turbine, which turned at only 300 revolutions per minute, made her one of the quietest submarines of her era. The S5G design was later scaled up into the S8G reactor of the Ohio-class submarines. She was decommissioned on 1 July 1999 and dismantled under the Navy recycling program by October 2020.

Facts
Year
1967 1
Propulsion
Nuclear 1
Status
Scrapped 1
Comparison
Body Style
Submarine 1
Connections

Of Make

Source USS Narwhal (SSN-671) (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source USS Narwhal (SSN-671) (Wikipedia)Lead, construction, manufacturer
Quote, Lead, construction, manufacturer
Her keel was laid down on 17 January 1966 by the Electric Boat Division of General Dynamics Corporation, in Groton, Connecticut.

Originated In

Also in Geography Atlas: where this subject originated.

Source USS Narwhal (SSN-671) (Wikipedia)Lead
Quote, Lead
USS Narwhal (SSN-671), a unique submarine, was the third vessel of the United States Navy to be named for the narwhal
Sources
1. USS Narwhal (SSN-671) (Wikipedia)
  • Lead, construction
    She was launched on 9 September 1967
  • Lead
    USS Narwhal (SSN-671), a unique submarine, was the third vessel of the United States Navy to be named for the narwhal
  • Design
    Her reactor compartment and engine room were unlike those of previous classes due to her unique natural circulation S5G reactor and direct-drive turbine propulsion plant.
  • Final disposition
    The boat was subsequently dismantled by October 2020
  • Lead, construction, manufacturer
    Her keel was laid down on 17 January 1966 by the Electric Boat Division of General Dynamics Corporation, in Groton, Connecticut.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.