The S3 was a French land-based intermediate-range ballistic missile, known in French as an SSBS (Sol-Sol Balistique Stratégique, or ground-ground strategic ballistic missile). It was a two-stage, solid-propellant missile whose first stage was inherited from the S2, with a P16 solid fuel engine and four exhausts, and it carried a single 1.2 megatonne thermonuclear warhead that was hardened and fitted with penetration aids. The first stage carried 16,940 kilograms of fuel and burned for 72 seconds, and the second stage carried 6,015 kilograms and burned for 58 seconds. A programme begun in 1973 and completed in 1980 produced the missile for the Apt-Saint-Christol air base, where it entered service in 1982. Forty missiles were built, 13 of them used on trials, and the 18 silos were deactivated in September 1996 and later dismantled.
Facts
Engine Class In the Other Atlases
Same As
Also in War and Military Atlas: the same subject.
Originated In
Also in Geography Atlas: where this subject originated.
Source S3 (missile) (Wikipedia)Lead, body styleQuote, Lead, body style
The S3 was a French land-based intermediate-range ballistic missile
Sources
1. S3 (missile) (Wikipedia)
Lead
entering service in 1982
Lead, status
The 18 S3D missile silos were deactivated in September 1996
Lead, body style
The S3 was a French land-based intermediate-range ballistic missile
Lead, engine class
The S3 is a two-stage, solid-propellant intermediate-range ballistic missile (IRBM).
View the Source2. Encyclopedia Astronautica: SSBS S3
Encyclopedia AstronauticaDescriptionQuote, Description
Boost Propulsion: Solid rocket.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.