Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

Mastodonte dei Giovi (locomotive)

Steam and Early Locomotives

The Mastodonte dei Giovi was a double steam locomotive built for the steep Apennine stretch of the Turin to Genoa railway across the Giovi Pass, which was inaugurated in 1853. The engineer Germain Sommeiller coupled two well-proven two-axle 0-4-0 locomotives of Stephenson design back to back, with a semi-permanent but detachable coupling and a jointed platform so that a single driver and stoker could run the pair. Ten pairs were built between 1853 and 1855, five by Robert Stephenson and Company in England and five by John Cockerill and Company at Seraing in Belgium. A pair delivered 382 horsepower and could haul a train of 130 tonnes at 12 kilometres per hour on a 3.6 percent gradient. The name was borrowed from a large fossil found while the tunnel near Busalla was excavated. The pairs served until the mid 1870s, when Beugniot locomotives replaced them, and some units were then split and rebuilt as separate tank engines that were scrapped in 1911 and 1912.

Facts
Year
1853 1
Engine Class
Steam 1
Status
Retired from service 1
Comparison
Body Style
Steam Locomotive 1
Connections

Exemplifies

Rail Transport, Modes
Source Mastodonte dei Giovi (locomotive) (Wikipedia)

Of Make

Source Mastodonte dei Giovi (locomotive) (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Mastodonte dei Giovi (locomotive) (Wikipedia)History, builders
Quote, History, builders
Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.

Originated In

Also in Geography Atlas: where this subject originated.

Source Mastodonte dei Giovi (locomotive) (Wikipedia)Lead, purpose
Quote, Lead, purpose
built specifically for use on the difficult Apennine stretch of the new Turin - Genoa railway line
Sources
1. Mastodonte dei Giovi (locomotive) (Wikipedia)
  • History, builders
    Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
  • Lead, type
    was a special double steam locomotive
  • Lead, steam
    was a special double steam locomotive
  • History, replacement
    The locomotives served until the mid 1870s, when they were replaced by Beugniot locomotives
  • Lead, purpose
    built specifically for use on the difficult Apennine stretch of the new Turin - Genoa railway line
  • Of Make: Robert Stephenson and Company, History, builders, make
    Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
  • Exemplifies: Rail Transport, History, builders, rail mode
    Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.