The Mastodonte dei Giovi was a double steam locomotive built for the steep Apennine stretch of the Turin to Genoa railway across the Giovi Pass, which was inaugurated in 1853. The engineer Germain Sommeiller coupled two well-proven two-axle 0-4-0 locomotives of Stephenson design back to back, with a semi-permanent but detachable coupling and a jointed platform so that a single driver and stoker could run the pair. Ten pairs were built between 1853 and 1855, five by Robert Stephenson and Company in England and five by John Cockerill and Company at Seraing in Belgium. A pair delivered 382 horsepower and could haul a train of 130 tonnes at 12 kilometres per hour on a 3.6 percent gradient. The name was borrowed from a large fossil found while the tunnel near Busalla was excavated. The pairs served until the mid 1870s, when Beugniot locomotives replaced them, and some units were then split and rebuilt as separate tank engines that were scrapped in 1911 and 1912.
Facts
Engine Class Connections
Exemplifies
Source Mastodonte dei Giovi (locomotive) (Wikipedia)
Of Make
Source Mastodonte dei Giovi (locomotive) (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Mastodonte dei Giovi (locomotive) (Wikipedia)History, buildersQuote, History, builders
Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
Originated In
Also in Geography Atlas: where this subject originated.
Source Mastodonte dei Giovi (locomotive) (Wikipedia)Lead, purposeQuote, Lead, purpose
built specifically for use on the difficult Apennine stretch of the new Turin - Genoa railway line
Sources
1. Mastodonte dei Giovi (locomotive) (Wikipedia)
History, builders
Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
Lead, type
was a special double steam locomotive
Lead, steam
was a special double steam locomotive
History, replacement
The locomotives served until the mid 1870s, when they were replaced by Beugniot locomotives
Lead, purpose
built specifically for use on the difficult Apennine stretch of the new Turin - Genoa railway line
Of Make: Robert Stephenson and Company, History, builders, make
Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.
Exemplifies: Rail Transport, History, builders, rail mode
Ten pairs were built between 1853 and 1855; five by Stephenson in England and five by John Cockerill and Company in Seraing, Belgium.