The Lockheed Martin VH-71 Kestrel was a cancelled presidential transport helicopter, a variant of the AgustaWestland AW101 that the United States Marine Corps selected to replace the Marine One fleet. Marketed first as the US101, it was developed and built in the United States by a consortium headed by Lockheed Martin Systems Integration at Owego, with AgustaWestland and Bell Helicopter as partners; AgustaWestland built the main rotor blades and fuselage sections at Yeovil in the United Kingdom, where the first test VH-71A flew on 3 July 2007. The Department of Defense chose the US101 in January 2005 for the VXX Presidential Helicopter Replacement Program and it received the VH-71 designation that July, but delays, cost overruns and engineering problems followed, with projected costs passing 13 billion dollars for 28 aircraft. The Navy terminated the contract in June 2009 after nine had been delivered, and the aircraft were later sold to Canada as spares for its AW101-based CH-149 Cormorant fleet, seven being converted for service from 2018.
Facts
Engine Class Maximum Mass (kg) Connections
Derived From
Source Lockheed Martin VH-71 Kestrel (Wikipedia)
Exemplifies
Source Lockheed Martin VH-71 Kestrel (Wikipedia)
Of Make
Source Lockheed Martin VH-71 Kestrel (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Lockheed Martin VH-71 Kestrel (Wikipedia)Lead, manufacturerQuote, Lead, manufacturer
developed and manufactured in the US by a consortium headed by Lockheed Martin, consisting of Lockheed Martin Systems Integration – Owego (LMSI), AgustaWestland and Bell Helicopter
Originated In
Also in Geography Atlas: where this subject originated.
Source Lockheed Martin VH-71 Kestrel (Wikipedia)Lead, manufacturerQuote, Lead, manufacturer
developed and manufactured in the US by a consortium headed by Lockheed Martin, consisting of Lockheed Martin Systems Integration – Owego (LMSI), AgustaWestland and Bell Helicopter
Sources
1. Lockheed Martin VH-71 Kestrel (Wikipedia)
Testing, first flight
The first test VH-71A, Test Vehicle #2 (TV-2), made its initial flight on 3 July 2007 at AgustaWestland's facility in Yeovil in the UK.
Specifications: Powerplant
Powerplant: 3× General Electric CT7-8E turboshafts, 2,520 shp (1,879 kW) (take-off power) each
Specifications: Empty weight
Empty weight: 23,149 lb (10,500 kg)
Specifications: Maximum mass
Max takeoff weight: 34,392 lb (15,600 kg)
Program problems and delays
Nine VH-71s had been completed at time of the cancellation.
Program problems and delays, status
On 1 June 2009, the U.S. Navy announced that the contract was officially canceled
Lead
was a variant of the AgustaWestland AW101 helicopter that was being manufactured to replace the United States Marine Corps' Marine One U.S. presidential transport fleet
Lead, manufacturer
developed and manufactured in the US by a consortium headed by Lockheed Martin, consisting of Lockheed Martin Systems Integration, Owego (LMSI), AgustaWestland and Bell Helicopter