Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

Indian locomotive class WCAM-1

Diesel and Electric Locomotives

The Indian locomotive class WCAM-1 was a class of dual-voltage electric locomotives, working from 25 kV AC or 1.5 kV DC, developed in 1973 by Chittaranjan Locomotive Works for Indian Railways. The class name reads broad gauge (W), direct current (C), alternating current (A), mixed traffic (M), first generation (1). They entered service in March 1973 and 53 were built between 1973 and 1979, the most numerous class of mainline dual-power AC and DC electric locomotive. The article calls them a bi-current version of the WAM-4, one of the most successful locomotives of Indian Railways, in passenger and freight service for over 40 years until 2015, and says all have been scrapped with none preserved.

Facts
Year
1973 1
Propulsion
Electric 1
Status
Scrapped 1
Units Built
53 1
Comparison
Body Style
Electric Locomotive 1
Connections

Exemplifies

Rail Transport, Modes
Source Indian locomotive class WCAM-1 (Wikipedia)

Of Make

Source Indian locomotive class WCAM-1 (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Indian locomotive class WCAM-1 (Wikipedia)Lead, builder
Quote, Lead, builder
that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways

Originated In

Also in Geography Atlas: where this subject originated.

Source Indian locomotive class WCAM-1 (Wikipedia)Lead, operator
Quote, Lead, operator
that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
Sources
1. Indian locomotive class WCAM-1 (Wikipedia)
  • Lead, body style
    was a class of dual-voltage (25 kV AC and 1.5 kV DC) electric locomotives that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • Lead, propulsion
    was a class of dual-voltage (25 kV AC and 1.5 kV DC) electric locomotives that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • Lead, year
    They entered service in March 1973.
  • Lead, units built
    A total of 53 WCAM-1 were built at CLW between 1973 and 1979
  • Lead, status
    All units have been scrapped with no locomotives preserved.
  • Lead, builder
    that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • Lead, operator
    that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • Of Make: Chittaranjan Locomotive Works, Lead
    that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • In Group: Main-Line Electric Locomotives, Lead, locomotive class
    was a class of dual-voltage (25 kV AC and 1.5 kV DC) electric locomotives that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
  • Exemplifies: Rail Transport, Lead, rail mode
    was a class of dual-voltage (25 kV AC and 1.5 kV DC) electric locomotives that was developed in 1973 by Chittaranjan Locomotive Works for Indian Railways
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.