Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

GWR Iron Duke Class

Steam and Early Locomotives

The GWR Iron Duke Class was a class of 4-2-2 broad gauge steam locomotives built for express passenger work on the Great Western Railway, whose broad gauge had a rail spacing of just over seven feet. The prototype, Great Western, was built in April 1846 as a 2-2-2 and soon converted to a 4-2-2, and the rest of the class entered service from April 1847. The engines were recorded at 78.2 mph and hauled the Flying Dutchman, for decades the fastest express train in the world. From about 1865 the class was known as the Alma Class, and later locomotives of similar design are called the Rover Class. The last original, Lord of the Isles, was scrapped in 1906, and the remaining engines were withdrawn when the broad gauge ended in May 1892.

Facts
Year
1846 1
Propulsion
Steam 1
Engine Class
Steam 1
Status
Retired from service 1
Comparison
Body Style
Steam Locomotive 1
Connections

Exemplifies

Rail Transport, Modes
Source GWR Iron Duke Class (Wikipedia)

Of Make

Source GWR Iron Duke Class (Wikipedia)
Source Britain's Steam Railway Encyclopedia: GWR Iron Duke Class
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source GWR Iron Duke Class (Wikipedia)Lead, manufacturer
Quote, Lead, manufacturer
The Great Western Railway Iron Duke Class 4-2-2 was a class of

Also in Business Atlas: the manufacturer of this subject.

Source Britain's Steam Railway Encyclopedia: GWR Iron Duke ClassSummary, builder
Quote, Summary, builder
The prototype Great Western was completed at Swindon in April 1846, the first locomotive built at Swindon
Sources
1. GWR Iron Duke Class (Wikipedia)
  • History
    was built as a 2-2-2 locomotive in April 1846
  • Lead, energy source
    broad gauge steam locomotives for express passenger train work
  • Lead, engine class
    broad gauge steam locomotives for express passenger train work
  • History, status
    the other locomotives to the later design were all withdrawn with the end of the GWR
  • Lead, manufacturer
    The Great Western Railway Iron Duke Class 4-2-2 was a class of
  • Of Make: Great Western Railway, Lead
    The Great Western Railway Iron Duke Class 4-2-2 was a class of
  • In Group: British Main-Line Passenger Steam Locomotives, Lead
    broad gauge steam locomotives for express passenger train work
  • Exemplifies: Rail Transport, Lead
    broad gauge steam locomotives for express passenger train work
View the Source
Britain's Steam Railway Encyclopedia: GWR Iron Duke Class
Britain's Steam Railway EncyclopediaOf Make: Swindon Works, Summary, builder
Quote, Of Make: Swindon Works, Summary, builder
The prototype Great Western was completed at Swindon in April 1846, the first locomotive built at Swindon
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.