Diagram E.159 was a Great Western Railway brake corridor composite with two first class and four third class compartments. Fifteen coaches were built to it at Swindon, the first in 1938, and No 7371 of 1941, on lot 1640 and 60 feet 11.75 inches long, was the last of them. In its final years with the railway it formed part of the Swindon test train, and the Great Western Society later acquired it. After service in the Vintage Train it was withdrawn in the early 1990s for a quick repaint that revealed badly rusted galvanised panels, so the panels were replaced and safety glass fitted. The interior was restored with green sea shell moquette woven to the original pattern for third class and brown moquette with gold piping for first class, and the coach returned to service in 2020 in chocolate and cream livery.
Facts
SignificanceCorridor stock of the later 1930s was entered through the corridor and end vestibules. 2 Connections
Exemplifies
Source No 7371 Collett Brake Composite (Didcot Railway Centre)
Of Make
Source No 7371 Collett Brake Composite (Didcot Railway Centre)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source No 7371 Collett Brake Composite (Didcot Railway Centre)No 7371 Collett Brake Composite, build line, builderQuote, No 7371 Collett Brake Composite, build line, builder
Build date 1941 Built at Swindon
Originated In
Also in Geography Atlas: where this subject originated.
Source No 7371 Collett Brake Composite (Didcot Railway Centre)No 7371 Collett Brake Composite, build line, originQuote, No 7371 Collett Brake Composite, build line, origin
Build date 1941 Built at Swindon
Sources
1. No 7371 Collett Brake Composite (Didcot Railway Centre)
No 7371 Collett Brake Composite, year
this was the last of 15 coaches built to diagram E.159, the first being constructed in 1938
No 7371 Collett Brake Composite, body style
A brake corridor composite vehicle with two first and four third class compartments
No 7371 Collett Brake Composite, preservation
The coach re-entered service in 2020.
No 7371 Collett Brake Composite, number built
this was the last of 15 coaches built to diagram E.159
No 7371 Collett Brake Composite, build line, builder
Build date 1941 Built at Swindon
No 7371 Collett Brake Composite, build line, origin
Build date 1941 Built at Swindon
Of Make: Swindon Works, No 7371 Collett Brake Composite, build line, make
Build date 1941 Built at Swindon
Exemplifies: Rail Transport, No 7371 Collett Brake Composite, test train
In its final years in railway service this coach formed part of the Swindon test train
View the Source2. Coaches of the Great Western Railway (Wikipedia)
Coaches article, fleet history, No 7371 Collett Brake CompositeQuote, Coaches article, fleet history, No 7371 Collett Brake Composite
all new GWR main line stock had large windows to each compartment and entry-exit via the corridor and end vestibules
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.