Vehicle

GWR Collett brake composite diagram E159

Passenger Rolling Stock and High-Speed Trainsets

Diagram E.159 was a Great Western Railway brake corridor composite with two first class and four third class compartments. Fifteen coaches were built to it at Swindon, the first in 1938, and No 7371 of 1941, on lot 1640 and 60 feet 11.75 inches long, was the last of them. In its final years with the railway it formed part of the Swindon test train, and the Great Western Society later acquired it. After service in the Vintage Train it was withdrawn in the early 1990s for a quick repaint that revealed badly rusted galvanised panels, so the panels were replaced and safety glass fitted. The interior was restored with green sea shell moquette woven to the original pattern for third class and brown moquette with gold piping for first class, and the coach returned to service in 2020 in chocolate and cream livery.

Facts
Year
1938 1
Significance
Corridor stock of the later 1930s was entered through the corridor and end vestibules. 2
Status
Surviving 1
Units Built
15 1
Comparison
Body Style
Passenger carriage 1
Connections

Exemplifies

Rail Transport, Modes
Source No 7371 Collett Brake Composite (Didcot Railway Centre)

Of Make

Source No 7371 Collett Brake Composite (Didcot Railway Centre)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source No 7371 Collett Brake Composite (Didcot Railway Centre)No 7371 Collett Brake Composite, build line, builder
Quote, No 7371 Collett Brake Composite, build line, builder
Build date 1941 Built at Swindon

Originated In

Also in Geography Atlas: where this subject originated.

Source No 7371 Collett Brake Composite (Didcot Railway Centre)No 7371 Collett Brake Composite, build line, origin
Quote, No 7371 Collett Brake Composite, build line, origin
Build date 1941 Built at Swindon
Sources
1. No 7371 Collett Brake Composite (Didcot Railway Centre)
  • No 7371 Collett Brake Composite, year
    this was the last of 15 coaches built to diagram E.159, the first being constructed in 1938
  • No 7371 Collett Brake Composite, body style
    A brake corridor composite vehicle with two first and four third class compartments
  • No 7371 Collett Brake Composite, preservation
    The coach re-entered service in 2020.
  • No 7371 Collett Brake Composite, number built
    this was the last of 15 coaches built to diagram E.159
  • No 7371 Collett Brake Composite, build line, builder
    Build date 1941 Built at Swindon
  • No 7371 Collett Brake Composite, build line, origin
    Build date 1941 Built at Swindon
  • Of Make: Swindon Works, No 7371 Collett Brake Composite, build line, make
    Build date 1941 Built at Swindon
  • Exemplifies: Rail Transport, No 7371 Collett Brake Composite, test train
    In its final years in railway service this coach formed part of the Swindon test train
View the Source
2. Coaches of the Great Western Railway (Wikipedia)
Coaches article, fleet history, No 7371 Collett Brake Composite
Quote, Coaches article, fleet history, No 7371 Collett Brake Composite
all new GWR main line stock had large windows to each compartment and entry-exit via the corridor and end vestibules
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.

Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme