Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

GWR 7200 Class

Steam and Early Locomotives

The Great Western Railway 7200 Class was a class of 2-8-2T steam locomotives, the only 2-8-2Ts built and used by a British railway and the largest tank engines to run on the GWR. They were made by rebuilding earlier 2-8-0T locomotives of the 4200 and 5205 classes at Swindon Works after the 1929 stock market crash cut South Wales coal traffic: Charles Collett added 4 feet to the frames, which required a trailing axle and allowed an extended coal bunker for greater range. The first, 5275, returned to traffic as No. 7200 in August 1934, and 54 locomotives were rebuilt by 1939. Weighing 92 long tons 12 cwt, they worked in most parts of the GWR system, including iron ore and stone trains from Banbury. The first was withdrawn in November 1962, the last in June 1965, and three survive.

Facts
Year
1934 1
Propulsion
Steam 1
Engine Class
Steam 1
Status
Retired from service 1
Units Built
54 1
Comparison
Body Style
Steam Locomotive 1
Connections

Exemplifies

Rail Transport, Modes
Source GWR 7200 Class (Wikipedia)

Of Make

Source GWR 7200 Class (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source GWR 7200 Class (Wikipedia)Rebuild and operation, manufacturer
Quote, Rebuild and operation, manufacturer
Rebuilt at Swindon Works, the first to be converted was 5275

Originated In

Also in Geography Atlas: where this subject originated.

Source GWR 7200 Class (Wikipedia)Lead, country of origin
Quote, Lead, country of origin
the largest tank engines to run on the Great Western Railway
Sources
1. GWR 7200 Class (Wikipedia)
  • Rebuild and operation
    which returned to traffic numbered 7200 in August 1934
  • Rebuild and operation, units built
    The 54 rebuilt locos found work in most parts of the GWR system
  • Lead
    is a class of 2-8-2T steam locomotive
  • Withdrawal
    The first member of the class to be withdrawn was number 7241 in November 1962, whilst the last four engines in traffic served until June 1965.
  • Rebuild and operation, manufacturer
    Rebuilt at Swindon Works, the first to be converted was 5275
  • Lead, country of origin
    the largest tank engines to run on the Great Western Railway
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.