The European Service Module is the service module of the Orion spacecraft, providing its primary power and propulsion until it is discarded at the end of each mission. NASA announced in January 2013 that the European Space Agency would contribute the module for Artemis I, based on the agency Automated Transfer Vehicle, and Airbus Defence and Space delivered the first one from Bremen, Germany, at the end of 2018. It is about 5.0 metres in diameter and 4.0 metres long and made of aluminium-lithium alloy, and for the first six modules the main engine is a refurbished AJ10-190 supplied by NASA that had flown on the Space Shuttle. It provides the water and oxygen for a habitable environment, generates and stores electrical power, and can support a crew of four for 21 days. The module first flew on Artemis I on 16 November 2022, and ESA plans to provide modules up to Artemis VI. On the 2026 Artemis II mission a helium leak was seen in its pressurization system, and NASA said the valve system will probably need design changes.
Facts
Maximum Mass (kg) EngineAJ10-190, refurbished from the Space Shuttle Orbital Maneuvering System 1 Connections
Exemplifies
Source European Service Module (Wikipedia)
Of Make
Source European Service Module (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source European Service Module (Wikipedia)Lead, manufacturerQuote, Lead, manufacturer
It was delivered by Airbus Defence and Space from Bremen, Germany, to NASA at the end of 2018.
Originated In
Also in Geography Atlas: where this subject originated.
Source European Service Module (Wikipedia)Lead, manufacturerQuote, Lead, manufacturer
It was delivered by Airbus Defence and Space from Bremen, Germany, to NASA at the end of 2018.
Sources
1. European Service Module (Wikipedia)
Lead
The European Service Module (ESM) is the service module component of the Orion spacecraft
Lead, first flight
The module's first flight was Artemis I, the first major milestone in NASA's Artemis program to return humans to the Moon, on November 16, 2022.
Design, main engine
the main engine will be a NASA-provided refurbished AJ10-190 previously used with the Space Shuttle Orbital Maneuvering System
Design, fully fueled mass
weighs nearly 40% less when fully fueled (15,461 kg, vs 24,520 kg)
Lead, continued provision
After approval of the first module, ESA provided the ESM for Artemis II with current plans to continue the provision up to Artemis VI.
Lead, manufacturer
It was delivered by Airbus Defence and Space from Bremen, Germany, to NASA at the end of 2018.
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.