Four saddle tank locomotives of Robert Stephenson and Company formed the core of the Cleator and Workington Junction Railway fleet in Cumberland. The first, number 3 with works number 2553, arrived in 1884 to the makers standard design, with 4 foot 6 inch wheels, 17 by 24 inch cylinders, a 140 pound boiler and an open backed cab. Numbers 5 to 7, Moresby Hall, Brigham Hill and Ponsonby Hall, with works numbers 2692, 2813 and 2846, followed with 160 pound boilers and covered cabs. Sources differ on details: one calls number 3 Rothersyke and another South Lodge, and the date of Moresby Hall is given as 1890 or 1892. Number 3 was withdrawn in 1920.
Facts
SignificanceNumber 3 carried works number 2553 and dated from 1884 2 Engine Class EngineInside cylinders of 17 by 24 inches according to Steam Index 1 Connections
Exemplifies
Source Furness Railway locomotives (Steam Index)
Of Make
Source Furness Railway locomotives (Steam Index)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Furness Railway locomotives (Steam Index)Cleator and Workington, added engines namedQuote, Cleator and Workington, added engines named
Three further Stephenson 0-6-0STs
Sources
1. Furness Railway locomotives (Steam Index)
Cleator and Workington, delivery year
delivered in 1884 (WN 2553)
Cleator and Workington, saddle tank engine
The saddle tank extended over the firebox but left the smokebox
Cleator and Workington, cylinders
inside cylinders 17 in. x 24 in.
Cleator and Workington, added engines
Three further Stephenson 0-6-0STs were added to stock
Cleator and Workington, boiler
and the boiler worked
Cleator and Workington, withdrawal of number 3
This engine worked until 1920, when
Cleator and Workington, added engines named
Three further Stephenson 0-6-0STs
Of Make: Robert Stephenson and Company, Cleator and Workington, first stock engine
Robert Stephenson & Co.'s standard design
Exemplifies: Rail Transport, Cleator and Workington, line opened
The mainline from Cleator Moor to Workington
View the Source2. Cleator and Workington Junction Railway (Wikipedia)
Locomotives, number 3Quote, Locomotives, number 3
An outside cylinder 0-6-0ST of 1884, built by Robert Stephenson and Company for the C&WJR. Builders No. 2553.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.