Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

Arthur Middleton-class attack transport

Marine Vehicles

The Arthur Middleton class was a group of three United States Navy attack transports, Arthur Middleton, George Clymer and Samuel Chase, built for the amphibious campaigns of the Second World War. An attack transport carried troops and their equipment to hostile shores together with a large number of its own landing craft, and was armed heavily against aircraft because its cargo of troops was so vulnerable. The class was based on the Maritime Commission Type C3 hull in its passenger and cargo form, and all three ships were laid down at Ingalls Shipbuilding in Pascagoula, Mississippi, between July and October 1940. Samuel Chase was commissioned first, on 13 June 1942, and Arthur Middleton, the lead ship, followed on 7 September 1942. Two ships served mostly in the Pacific, while Samuel Chase took part in the landings in North Africa, Sicily, Italy and Normandy before the Okinawa campaign. George Clymer stayed in commission through the Korean and Vietnam wars and retired in 1967.

Facts
Year
1942 1
Propulsion
Steam 2
Engine Class
Steam 2
Status
Scrapped 1
Comparison
Body Style
Attack transport 1
Connections

Exemplifies

Source Arthur Middleton-class attack transport (Wikipedia)

Of Make

Source Arthur Middleton-class attack transport (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Arthur Middleton-class attack transport (Wikipedia)Background, builder
Quote, Background, builder
All three ships were laid down by the Ingalls Shipbuilding Company of Pascagoula, Mississippi, between July and October 1940.

Originated In

Also in Geography Atlas: where this subject originated.

Source Arthur Middleton-class attack transport (Wikipedia)Lead, US Navy
Quote, Lead, US Navy
The Arthur Middleton-class attack transport was a class of three US Navy attack transports that saw most of their service in World War II.
Sources
1. Arthur Middleton-class attack transport (Wikipedia)
  • Background, first commissioning
    The first to be commissioned was Samuel Chase on 13 June 1942
  • Lead, US Navy
    The Arthur Middleton-class attack transport was a class of three US Navy attack transports that saw most of their service in World War II.
  • In service, fate
    Her two sister ships, decommissioned more than 20 years earlier, followed her to the scrapyard on 9 May 1973.
  • Background, builder
    All three ships were laid down by the Ingalls Shipbuilding Company of Pascagoula, Mississippi, between July and October 1940.
  • Of Make: Ingalls Shipbuilding, Background
    All three ships were laid down by the Ingalls Shipbuilding Company of Pascagoula, Mississippi, between July and October 1940.
  • In Group: Naval Auxiliary, Support and Survey Ships, Lead, ship type
    The Arthur Middleton-class attack transport was a class of three US Navy attack transports that saw most of their service in World War II.
  • Exemplifies: Maritime Transport, Lead, sea transport
    The Arthur Middleton-class attack transport was a class of three US Navy attack transports that saw most of their service in World War II.
View the Source
2. Navypedia: ARTHUR MIDDLETON amphibious personnel transports (1941 - 1942)
NavypediaTechnical data, engine type
Quote, Technical data, engine type
General Electric geared steam turbine, 2 Foster Wheeler boilers
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.