Vehicle

EV-E801 series

Passenger Rolling Stock and High-Speed Trainsets

The EV-E801 series, branded Accum, is a two car battery electric multiple unit that East Japan Railway Company has used on the Oga Line in Akita Prefecture since March 2017. Developed from the 817 series battery train of JR Kyushu with changes for colder weather, it draws current from the 20 kV AC wire between Akita and Oiwake and runs on lithium ion batteries of 360 kWh on the unwired line to Oga. Its maximum speed is 110 kilometres per hour under wires and 85 on battery power. The first set came from the Hitachi works at Kudamatsu in December 2016, and more followed in 2020.

Facts
Year
2017 1
Propulsion
Electric 1
Status
In service 1
Top Speed (km/h)
110 1
Comparison
Body Style
Multiple unit 1
Connections

Exemplifies

Rail Transport, Modes
Source EV-E801 series (Wikipedia)

Of Make

Source EV-E801 series (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source EV-E801 series (Wikipedia)History, delivery works, manufacturer
Quote, History, delivery works, manufacturer
The two-car trainset was delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot in December 2016.

Originated In

Also in Geography Atlas: where this subject originated.

Source EV-E801 series (Wikipedia)History, delivery works, origin country
Quote, History, delivery works, origin country
delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot
Sources
1. EV-E801 series (Wikipedia)
  • Lead, service since
    on the Oga Line in Akita Prefecture in northern Japan since 4 March 2017.
  • Lead, vehicle form
    is a two-car battery electric multiple unit (BEMU) train type
  • Lead, traction
    is a two-car battery electric multiple unit (BEMU) train type operated by East Japan Railway Company
  • Lead, current operation
    operated by East Japan Railway Company (JR East) on the Oga Line in Akita Prefecture
  • Overview, maximum speed
    operates at a maximum speed of 110 km/h (70 mph) under overhead wires
  • History, delivery works, manufacturer
    The two-car trainset was delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot in December 2016.
  • History, delivery works, origin country
    delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot
  • Of Make: Hitachi Rail, History, delivery works, make
    The two-car trainset was delivered from the Hitachi factory in Kudamatsu, Yamaguchi to Akita Depot in December 2016.
  • Exemplifies: Rail Transport, Lead, vehicle form, transport mode
    is a two-car battery electric multiple unit (BEMU) train type
  • In Group: Multiple Unit Trains, Lead, vehicle form, vehicle group
    is a two-car battery electric multiple unit (BEMU) train type
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.

Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme