Bow-ended coaches were a Great Western Railway carriage design of the Collett period, first brought out in 1922 in lengths of 57 and 70 feet. They followed the earlier Toplight pattern closely, but the ends of the body were bowed outward so that the gangways between coaches could be shorter. Earlier coaches had flat ends, and the bowed shape also made it easier to fit the Buckeye couplers then gaining favour on British passenger trains. The coaches were plainer than their predecessors, with flush sides that had no raised beading. Charles Collett stopped using the bowed ends in 1933. Third class coach 4553, built at Swindon in 1925 as Lot 1352 to Diagram C54, was an eight compartment corridor third that later had its partitions removed and was used for storage. A sister coach, 5085, built at Swindon in 1928 as Lot 1383 to the same diagram, ended its working days at Reading as a mess coach for the signalling and telegraph staff. Both vehicles are preserved at Didcot Railway Centre.
Facts
SignificanceCharles Collett stopped using the bow-ended coach design in 1933. 3 Connections
Exemplifies
Source No 5085 Collett 8 Compartment Bow-Ended Third (Didcot Railway Centre)
Of Make
Source No 5085 Collett 8 Compartment Bow-Ended Third (Didcot Railway Centre)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source No 5085 Collett 8 Compartment Bow-Ended Third (Didcot Railway Centre)Coach 5085 data, builderQuote, Coach 5085 data, builder
Status Stored Build date 1928 Built at Swindon Original railway GWR
Originated In
Also in Geography Atlas: where this subject originated.
Source No 5085 Collett 8 Compartment Bow-Ended Third (Didcot Railway Centre)Coach 5085 data, originQuote, Coach 5085 data, origin
Status Stored Build date 1928 Built at Swindon Original railway GWR
Sources
1. No 5085 Collett 8 Compartment Bow-Ended Third (Didcot Railway Centre)
Design description
Bow-ended coaches are of a similar design to top-lights, but the coach ends are bowed out with the intention of making the gangways shorter.
Coach 5085 preservation
Date Preserved 1974
Coach 5085 data, builder
Status Stored Build date 1928 Built at Swindon Original railway GWR
Coach 5085 data, origin
Status Stored Build date 1928 Built at Swindon Original railway GWR
Of Make: Swindon Works, Coach 5085 data, make
Status Stored Build date 1928 Built at Swindon Original railway GWR
Exemplifies: Rail Transport, Gangways between coaches
the coach ends are bowed out with the intention of making the gangways shorter
View the Source2. Coaches of the Great Western Railway (Wikipedia)
1903-1930, bow-ended stockQuote, 1903-1930, bow-ended stock
The next significant change came in 1922 when bow-ended stock was introduced in both 57 ft and 70 ft lengths.
View the Source 3. SVR Wiki: GWR 6913 Brake Composite
SVR WikiCoach 6913, end of bow endsQuote, Coach 6913, end of bow ends
which he discontinued in 1933
View the Source 4. Didcot Railway Centre: No 4553 Collett Third Bow Ended
Didcot Railway CentreCoach 4553 preservationQuote, Coach 4553 preservation
Date Preserved 1974
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.