The Great Northern Railway Class H4, classified K3 by the London and North Eastern Railway, was a class of 2-6-0 steam locomotives designed for mixed-traffic work and was a more powerful development of the earlier H3 class. Its 6-foot-diameter boilers were the largest fitted to any British locomotive up to that date. The first ten were built at the GNR's Doncaster Works in 1920 to Nigel Gresley's design. After the grouping the type became an LNER standard, and six further batches came from Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company, the last of 193 examples being delivered in 1937. Crews nicknamed them Jazzers after their exhaust beat and unbalanced gyratory movement. All were withdrawn and scrapped between 1959 and 1962.
Facts
Engine Class Connections
Of Make
Source GNR Class H4 (Wikipedia)
Source GNR Class H4 (Wikipedia)
Source GNR Class H4 (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class H4 (Wikipedia)Construction, batchesQuote, Construction, batches
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class H4 (Wikipedia)Construction, first batchQuote, Construction, first batch
The first ten locomotives were built at the GNR's Doncaster Works in 1920
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class H4 (Wikipedia)BuildersQuote, Builders
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class H4 (Wikipedia)Construction, manufacturerQuote, Construction, manufacturer
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Sources
1. GNR Class H4 (Wikipedia)
Construction, first batch
The first ten locomotives were built at the GNR's Doncaster Works in 1920
Construction, units built
The last few of 193 examples were delivered in 1937
Lead, engine class
was a class of 2-6-0 steam locomotive designed for mixed-traffic work
Withdrawal
All were withdrawn and scrapped between 1959 and 1962
Construction, manufacturer
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Construction, batches
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Of Make: Robert Stephenson and Company, Construction
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.