The LNER Class P1 was a class of two 2-8-2 Mikado steam locomotives designed by Nigel Gresley as two of the most powerful freight locomotives ever built for a British railway. They were initially intended as a more powerful 2-10-0 version of the earlier Class O2 2-8-0s, for coal trains between Peterborough and London and between Immingham and Wath. Doncaster Works completed the first, number 2393, in June 1925 and the second, number 2394, in November 1925. They carried boosters on the trailing axle to raise tractive effort, but these proved troublesome and were removed in 1937 and 1938. The pair could handle 100-wagon coal trains but were coal-hungry and ran only between New England and Ferme Park, and both were withdrawn and scrapped in July 1945.
Facts
Engine Class Connections
Exemplifies
Source LNER Class P1 (Wikipedia)
Of Make
Source LNER Class P1 (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source LNER Class P1 (Wikipedia)ConstructionQuote, Construction
The first P1, No. 2393, was completed by Doncaster in June 1925
Originated In
Also in Geography Atlas: where this subject originated.
Source LNER Class P1 (Wikipedia)Lead, country of originQuote, Lead, country of origin
two of the most powerful freight locomotives ever designed for a British railway
Sources
1. LNER Class P1 (Wikipedia)
Construction
The first P1, No. 2393, was completed by Doncaster in June 1925
Lead
was a class of two steam locomotives designed by Nigel Gresley
Service and withdrawal
both engines were withdrawn and scrapped by Edward Thompson in July 1945
Lead, country of origin
two of the most powerful freight locomotives ever designed for a British railway
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.