The Great Northern Railway Class O1 was a class of two-cylinder 2-8-0 steam locomotives designed by Nigel Gresley for heavy freight work, built between 1913 and 1919. They were meant for the heavy coal trains on the main line from Grantham to London. Five were ordered in 1913 and completed at Doncaster in 1914, but a further fifteen ordered in January 1916 were delayed by the First World War and their construction passed to the North British Locomotive Company, which delivered ten in April 1918 and five more in late 1919. In 1944 the LNER redesignated the class O3 so that the O1 classification could be used for the Thompson class introduced during the Second World War. Seventeen examples passed to British Railways in 1948 and all had been withdrawn by 1952.
Facts
Engine Class Connections
Of Make
Source GNR Class O1 (Wikipedia)
Source GNR Class O1 (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class O1 (Wikipedia)History, builderQuote, History, builder
which were completed at Doncaster in 1914
Also in Business Atlas: the manufacturer of this subject.
Source GNR Class O1 (Wikipedia)HistoryQuote, History
construction was transferred to the North British Locomotive Company
Originated In
Also in Geography Atlas: where this subject originated.
Source GNR Class O1 (Wikipedia)British Railways, country of originQuote, British Railways, country of origin
survived into British Railways ownership in 1948
Sources
1. GNR Class O1 (Wikipedia)
Lead, construction
built by the GNR between 1913 and 1919
Lead, locomotive type
two-cylinder 2-8-0 steam locomotive
Lead, engine class
two-cylinder 2-8-0 steam locomotive
Lead, energy source
two-cylinder 2-8-0 steam locomotive
British Railways
all had been withdrawn by 1952
History, builder
which were completed at Doncaster in 1914
British Railways, country of origin
survived into British Railways ownership in 1948
Lead
a class of two-cylinder 2-8-0 steam locomotive
British Railways, status
but all had been withdrawn by 1952
Of Make: North British Locomotive Company, History
construction was transferred to the North British Locomotive Company
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.