Vehicle

GWR 3200 Class

Steam and Early Locomotives

The GWR 3200 Class, known as the Earl class and widely nicknamed the Dukedog, was a 4-4-0 steam locomotive for passenger work on the Great Western Railway. Charles Collett created it at Swindon Works from 1936 by combining Duke class boilers with Bulldog class frames, giving one of the last British standard gauge steam classes with outside frames. The light engines served routes with weight limits, notably in mid Wales. One example, number 9017, survives at the Bluebell Railway.

Facts
Year
1936 2
Engine Class
Steam 1
Status
Surviving 2
Comparison
Body Style
Steam Locomotive 1
Connections

Exemplifies

Rail Transport, Modes
Source GWR 3200 Class (Wikipedia)

Of Make

Source Steam Locomotives: GWR 3200 Dukedog Class
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Steam Locomotives: GWR 3200 Dukedog ClassIntroduction, builder
Quote, Introduction, builder
Built at Swindon Works between 1936 and 1939, the class combined the existing frames of the older Duke Class 4-4-0 with the larger and more modern boiler of the Bulldog Class.
Sources
1. GWR 3200 Class (Wikipedia)
  • Lead, engine type
    The Great Western Railway 3200 Class (or 'Earl' Class) was a design of 4-4-0 steam locomotive for passenger train work.
  • Lead, vehicle type
    The Great Western Railway 3200 Class (or 'Earl' Class) was a design of 4-4-0 steam locomotive for passenger train work.
  • Exemplifies: Rail Transport, Lead, railway locomotive class
    The Great Western Railway 3200 Class (or 'Earl' Class) was a design of 4-4-0 steam locomotive for passenger train work.
View the Source
2. Steam Locomotives: GWR 3200 Dukedog Class
Steam Locomotives
  • Introduction, first built
    Built at Swindon Works between 1936 and 1939, the class combined the existing frames of the older Duke Class 4-4-0 with the larger and more modern boiler of the Bulldog Class.
  • Preservation
    One Dukedog has survived.
  • Of Make: Swindon Works, Introduction, works
    Built at Swindon Works between 1936 and 1939, the class combined the existing frames of the older Duke Class 4-4-0 with the larger and more modern boiler of the Bulldog Class.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.

Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme