Vehicle

GNR Class H4

Steam and Early Locomotives

The Great Northern Railway Class H4, classified K3 by the London and North Eastern Railway, was a class of 2-6-0 steam locomotives designed for mixed-traffic work and was a more powerful development of the earlier H3 class. Its 6-foot-diameter boilers were the largest fitted to any British locomotive up to that date. The first ten were built at the GNR's Doncaster Works in 1920 to Nigel Gresley's design. After the grouping the type became an LNER standard, and six further batches came from Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company, the last of 193 examples being delivered in 1937. Crews nicknamed them Jazzers after their exhaust beat and unbalanced gyratory movement. All were withdrawn and scrapped between 1959 and 1962.

Facts
Year
1920 1
Engine Class
Steam 1
Status
Scrapped 1
Units Built
193 1
Comparison
Body Style
Steam Locomotive 1
Connections

Of Make

Source GNR Class H4 (Wikipedia)
Source GNR Class H4 (Wikipedia)
Source GNR Class H4 (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source GNR Class H4 (Wikipedia)Construction, batches
Quote, Construction, batches
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.

Also in Business Atlas: the manufacturer of this subject.

Source GNR Class H4 (Wikipedia)Construction, first batch
Quote, Construction, first batch
The first ten locomotives were built at the GNR's Doncaster Works in 1920

Also in Business Atlas: the manufacturer of this subject.

Source GNR Class H4 (Wikipedia)Builders
Quote, Builders
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.

Also in Business Atlas: the manufacturer of this subject.

Source GNR Class H4 (Wikipedia)Construction, manufacturer
Quote, Construction, manufacturer
Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
Sources
1. GNR Class H4 (Wikipedia)
  • Construction, first batch
    The first ten locomotives were built at the GNR's Doncaster Works in 1920
  • Construction, units built
    The last few of 193 examples were delivered in 1937
  • Lead, engine class
    was a class of 2-6-0 steam locomotive designed for mixed-traffic work
  • Withdrawal
    All were withdrawn and scrapped between 1959 and 1962
  • Construction, manufacturer
    Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
  • Construction, batches
    Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
  • Of Make: Robert Stephenson and Company, Construction
    Six further batches were built at Doncaster and Darlington Works, Armstrong Whitworth, Robert Stephenson and Company and the North British Locomotive Company.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.

Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme