The Furness Railway E1 Class was a class of 2-4-0 tender steam locomotives ordered from Sharp, Stewart and Company when heavier main line passenger trains outgrew the little single driver well tanks. The first two arrived in 1870, fifteen more followed within three years and a final pair came after a gap of nine years. The design was simple and capable of much hard work. Seven were rebuilt in 1891 as 2-4-2 side tanks for branch lines, and the last survivors passed into London, Midland and Scottish Railway stock.
Facts
Engine Class Connections
Exemplifies
Source Furness Railway locomotives (Steam Index)
Of Make
Source Furness Railway locomotives (Steam Index)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Furness Railway locomotives (Steam Index)Class E1, builderQuote, Class E1, builder
a new class of 2-4-0 tender engines was ordered from Sharp, Stewart & Co. to replace them.
Originated In
Also in Geography Atlas: where this subject originated.
Source Sharp, Stewart and Company (Wikipedia)Lead, builder locationQuote, Lead, builder location
Sharp, Stewart and Company was a steam locomotive manufacturer, originally based in Manchester, England.
Sources
1. Furness Railway locomotives (Steam Index)
Class E1, first delivery
The first pair, numbered 1 and 2, were delivered in 1870
Class E1, boilers, body style
some of them were rebuilt with new boilers, having flush fireboxes, during the latter 1890s.
Class E1, boilers, engine class
some of them were rebuilt with new boilers, having flush fireboxes, during the latter 1890s.
Class E1, withdrawal
one being withdrawn in 1923 and the other in the following year.
Class E1, builder
a new class of 2-4-0 tender engines was ordered from Sharp, Stewart & Co. to replace them.
Class E1, tender
tons of coal, weighing in working order 20 tons.
Of Make: Sharp, Stewart and Company, Class E1
a new class of 2-4-0 tender engines was ordered from Sharp, Stewart & Co. to replace them.
Exemplifies: Rail Transport, Class E1, passenger trains
The increased weight of main line passenger trains was getting beyond the capacity of the little single-driver well-tanks
View the Source2. History of the Furness Railway Locomotives (Institution of Mechanical Engineers)
PDF page 7Quote, PDF page 7
The first engines were delivered in 1870 and numbered 1 and 2, replacing the old Bury engines.
View the Source Sharp, Stewart and Company (Wikipedia)
Lead, builder locationQuote, Lead, builder location
Sharp, Stewart and Company was a steam locomotive manufacturer, originally based in Manchester, England.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.