Black Diamond was an early steam locomotive that Robert Stephenson and Company's Forth Street Works supplied to the Stockton and Darlington Railway in 1826, alongside Hope and Diligence. Grace's Guide counts it as the third locomotive built for the line, delivered in April 1826 and similar in design to Locomotion No. 1. The historian G. A. Sekon records that these engines had many faults: they were often short of steam, a strong wind could bring them to a stand, and the horse drawn trains behind them were then delayed.
Facts
Engine Class Connections
Exemplifies
Source The Evolution of the Steam Locomotive, 1803 to 1898, by G. A. Sekon (Internet Archive)
Of Make
Source The Evolution of the Steam Locomotive, 1803 to 1898, by G. A. Sekon (Internet Archive)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source The Evolution of the Steam Locomotive, 1803 to 1898, by G. A. Sekon (Internet Archive)Page 22, builderQuote, Page 22, builder
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
Originated In
Also in Geography Atlas: where this subject originated.
Source Grace's Guide: Robert Stephenson and Co (Grace's Guide)History, works locationQuote, History, works location
in Forth Street, Newcastle-upon-Tyne
Sources
1. The Evolution of the Steam Locomotive, 1803 to 1898, by G. A. Sekon (Internet Archive)
Faults of the early engines, engine
the radical fault of which was the shortness of steam
Page 22 delivery year
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
Page 22, builder
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
Of Make: Robert Stephenson and Company, Page 22
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
In Group: British Pioneer Steam Locomotives, Page 22 engines, group
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
Exemplifies: Rail Transport, Page 22 engines, mode
The Forth Street Works in 1826 supplied three more engines to the Stockton and Darlington Railway
View the Source2. Grace's Guide: Early Locomotives (Grace's Guide)
Grace's GuideBlack Diamond deliveryQuote, Black Diamond delivery
The third locomtive built for the Stockton and Darlington Railway and delivered in April 1826.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.