The Alloa Railway was a short Scottish line intended to carry traffic across the River Forth to Alloa without the use of a ferry. It was authorised by the Alloa Railway Act 1879 and ran about three miles from Dunmore Junction on the South Alloa branch of the Caledonian Railway, crossing the river on a swing bridge before ending in the town. The Caledonian Railway supported it financially from the start, agreed to maintain and manage it, and absorbed the company in 1884 before the line was even finished. A connecting line belonging to the North British Railway gave the two companies reciprocal running powers, and the Alloa Swing Bridge, the main engineering work, stayed in use until 1968 and was demolished in 1971.
Facts
Founded Year In the Other Atlases
Located In
Also in Geography Atlas: where this subject is located.
Source Alloa Railway (Wikipedia)History, authorising actQuote, History, authorising act
authorised by the Alloa Railway Act 1879 (42 & 43 Vict. c. ccxiv)
Sources
1. Alloa Railway (Wikipedia)
History
The railway was authorised by the Alloa Railway Act 1879
History, absorption
In 1884 the CR absorbed the Alloa Railway before the line had been completed.
History, authorising act
authorised by the Alloa Railway Act 1879 (42 & 43 Vict. c. ccxiv)
Part Of: Rail Transport, Lead
The Alloa Railway was intended to bridge the River Forth linking Alloa with the south
In Group: British Railway Companies, History, Caledonian Railway
In 1884 the CR absorbed the Alloa Railway before the line had been completed.
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.