The Alstom Movia R151 is the seventh generation of electric multiple unit on the North-South and East-West lines of Singapore's Mass Rapid Transit system, made by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun, under Contract R151. The Land Transport Authority first awarded Bombardier Transportation 66 trains in July 2018 and ordered 40 more in September 2020 for S$337.8 million; 106 six-car sets with 636 cars were delivered. They replaced all the C151, C651 and C751B trains, which had been in service for 25 years or more. The first two trains arrived on 21 February 2022, the first entered passenger service on 4 June 2023 and the last on 30 September 2026. The livery of green and red stripes resembles that of the C151C.
Facts
Connections
Exemplifies
Source Alstom Movia R151 (Wikipedia)
Of Make
Source Alstom Movia R151 (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Alstom Movia R151 (Wikipedia)Lead, builderQuote, Lead, builder
It is manufactured by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun
Sources
1. Alstom Movia R151 (Wikipedia)
Overview, entry into service
before entering passenger service from 4 June 2023
Overview, fleet
All R151 trains entered service by 30 September 2026.
Lead, unit type
is the seventh generation electric multiple unit (EMU) rolling stock
Lead, builder
It is manufactured by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun
Exemplifies: Rapid Transit, Lead, mode
Mass Rapid Transit (MRT) system
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.