LNER Class A4 2509 Silver Link was the first of the streamlined A4 Pacific steam locomotives built for the London and North Eastern Railway, entering service in 1935 to haul express passenger trains on the East Coast Main Line. It was one of four A4s finished in a two-tone grey livery to work the new Silver Jubilee train. On a demonstration run out of King's Cross on 27 September 1935 it reached 112.5 mph (181.1 km/h), a British record at the time, which started a speed contest between the LNER under Nigel Gresley and the LMS under William Stanier. Allocated to King's Cross shed, it was withdrawn on 29 December 1962 when Deltic diesels took over the express services, and it was broken up at Doncaster Works on 7 September 1963, the site where it had been built nearly 28 years earlier. Two of its nameplates are displayed at the National Railway Museum in York.
Facts
Engine Class Connections
Exemplifies
Source LNER Class A4 2509 Silver Link (Wikipedia)
Of Make
Source LNER Class A4 2509 Silver Link (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source LNER Class A4 2509 Silver Link (Wikipedia)Scrapping and legacy, manufacturerQuote, Scrapping and legacy, manufacturer
broken up for scrap at Doncaster Works on 7 September 1963, on the same site where it had been built nearly 28 years earlier
Originated In
Also in Geography Atlas: where this subject originated.
Source Doncaster Works (Wikipedia)LeadQuote, Lead
Doncaster Railway Works is a railway workshop located in Doncaster, England.
Sources
1. LNER Class A4 2509 Silver Link (Wikipedia)
Lead
built in 1935 for the London and North Eastern Railway
Lead, locomotive type
Steam Locomotive built in 1935 for the London and North Eastern Railway
Lead, propulsion
Steam Locomotive built in 1935 for the London and North Eastern Railway
Lead, engine class
Steam Locomotive built in 1935 for the London and North Eastern Railway
Scrapping and legacy
broken up for scrap at Doncaster Works on 7 September 1963
Scrapping and legacy, manufacturer
broken up for scrap at Doncaster Works on 7 September 1963, on the same site where it had been built nearly 28 years earlier
In Group: British Main-Line Passenger Steam Locomotives, Lead, service
built to haul express passenger trains on the East Coast Main Line (ECML)
Exemplifies: Rail Transport, Lead, mode
built to haul express passenger trains on the East Coast Main Line (ECML)
View the SourceDoncaster Works (Wikipedia)
LeadQuote, Lead
Doncaster Railway Works is a railway workshop located in Doncaster, England.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.