Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Infrastructure

Baku-Tbilisi-Ceyhan pipeline

Pipeline Infrastructure

The Baku-Tbilisi-Ceyhan pipeline is a roughly 1,768 kilometer crude oil pipeline running from the Azeri-Chirag-Gunashli oil field in the Caspian Sea to the Mediterranean Sea, connecting Baku in Azerbaijan to the Turkish port of Ceyhan by way of Tbilisi in Georgia. It is the second-longest oil pipeline built in the former Soviet Union after Russia's Druzhba pipeline, and the first oil pumped from its Baku end reached Ceyhan on 28 May 2006.

Facts
Completion Year
2006 1
Significance
Gave Caspian oil an export route that bypasses Russia, after all Soviet-era transport routes from the Caspian region ran through Russian territory. 1
Classification
Status
Operational 1
Sources
1. Wikipedia: Baku-Tbilisi-Ceyhan pipeline
  • Inauguration
    The first oil that was pumped from the Baku end of the pipeline reached Ceyhan on 28 May 2006.
  • Description
    at normal capacity it transports 1 million barrels per day (160×10^3 m3/d)
  • Background, routes
    During Soviet times, all transportation routes from the Caspian region were through Russia.
  • In Group: Oil Pipelines, Lead sentence
    The Baku-Tbilisi-Ceyhan (BTC) pipeline is a 1,768 kilometres (1,099 mi) long crude oil pipeline from the Azeri-Chirag-Gunashli oil field in the Caspian Sea to the Mediterranean Sea.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.