The Zeppelin-Staaken VGO.II was a heavy bomber built in Germany in 1915 by Versuchsbau Gotha-Ost, a division of Gothaer Waggonfabrik. It was developed from the VGO.I that the Imperial German Navy had bought, but the Army purchased the VGO.II instead, and only one was built. Construction began in December 1914, the first flight took place on 25 October 1915 and it was accepted into Army service on 28 November with the serial R.9/15. It added a redesigned tail with a larger gap between the horizontal surfaces and machine-gun positions in the fronts of the engine nacelles, changes later fitted to the VGO.I. Assigned to Rfa 500 at Auce in February 1916, it became the first R-plane to see combat, the earliest substantiated raid being on 13 August against the railway junction at Sloka. A downward-firing 130-millimetre cannon was tried in it but removed because it was inaccurate. It became a training machine in January 1917 and was eventually damaged beyond repair in a hard landing.
Facts
Engine Class Top Speed (km/h) Maximum Mass (kg) Connections
Exemplifies
Source Zeppelin-Staaken VGO.II (Wikipedia)
Of Make
Source Zeppelin-Staaken (Wikipedia)
In the Other Atlases
Manufactured By
Also in Business Atlas: the manufacturer of this subject.
Source Zeppelin-Staaken (Wikipedia)LeadQuote, Lead
formed in mid-1914 by Count Ferdinand von Zeppelin and Robert Bosch
Originated In
Also in Geography Atlas: where this subject originated.
Source Zeppelin-Staaken VGO.II (Wikipedia)Lead, country of originQuote, Lead, country of origin
was a heavy bomber built in Germany in 1915
Sources
1. Zeppelin-Staaken VGO.II (Wikipedia)
Development
the first flight took place on 25 October 1915
Operational history
It was eventually damaged beyond repair in a hard landing.
Specifications
3 × Maybach HS six-cylinder, water-cooled, inline piston engine
Specifications, mass
Empty weight: 6,637 kg (14,632 lb)
Specifications, maximum mass
Gross weight: 10,203 kg (22,494 lb)
Specifications, top speed
Maximum speed: 110 km/h (68 mph, 59 kn)
Lead
Although only one example was built
Lead, country of origin
was a heavy bomber built in Germany in 1915
View the SourceZeppelin-Staaken (Wikipedia)
Lead
formed in mid-1914 by Count Ferdinand von Zeppelin and Robert Bosch
Of Make: Zeppelin-Staaken, Aircraft built
Zeppelin-Staaken VGO.II
View the SourceReader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.