Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

USS Triton (SSRN-586)

Marine Vehicles

USS Triton (SSRN-586) was a nuclear-powered radar picket submarine of the United States Navy and the only member of her class. Built by the Electric Boat Division of General Dynamics at Groton, Connecticut, she was launched on 19 August 1958 and commissioned in 1959. She was the only Western submarine powered by two nuclear reactors, and at commissioning she was the largest, most powerful and most expensive submarine yet built. On her shakedown cruise in early 1960 she became the first vessel to circumnavigate the Earth submerged, in Operation Sandblast under Captain Edward L. Beach Jr. Her radar picket role was overtaken within about two years by carrier-based airborne early warning aircraft, she was converted to an attack submarine in 1962, and she was decommissioned on 3 May 1969, the first American nuclear submarine taken out of service.

Facts
Year
1958 1
Propulsion
Nuclear 1
Status
Scrapped 1
Comparison
Body Style
Submarine 1
Connections

Of Make

Source USS Triton (SSRN-586) (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source USS Triton (SSRN-586) (Wikipedia)Construction, keel laying
Quote, Construction, keel laying
Triton's keel was laid down on 29 May 1956 in Groton, Connecticut, by the Electric Boat Division of the General Dynamics Corporation.

Originated In

Also in Geography Atlas: where this subject originated.

Source USS Triton (SSRN-586) (Wikipedia)Lead
Quote, Lead
USS Triton (SSRN/SSN-586), the only member of her class, was a nuclear-powered radar picket submarine in the United States Navy.
Sources
1. USS Triton (SSRN-586) (Wikipedia)
  • Construction, launch
    Triton was launched on 19 August 1958
  • Lead
    USS Triton (SSRN/SSN-586), the only member of her class, was a nuclear-powered radar picket submarine in the United States Navy.
  • Lead, reactors
    She was the only Western submarine powered by two nuclear reactors.
  • Lead, recycling
    Triton landed on the keel resting blocks in the drydock basin on 1 October 2007 to begin this recycling process, which was completed effective 30 November 2009.
  • Construction, keel laying
    Triton's keel was laid down on 29 May 1956 in Groton, Connecticut, by the Electric Boat Division of the General Dynamics Corporation.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.