Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

USS Skate (SSN-578)

Marine Vehicles

USS Skate (SSN-578) was the lead ship of the Skate class of nuclear submarines of the United States Navy and the third nuclear submarine commissioned. The Electric Boat division of General Dynamics received the contract on 18 July 1955 and laid her keel at Groton, Connecticut, three days later; she was launched on 16 May 1957 and commissioned on 23 December 1957 under Commander James F. Calvert. In 1958 she made the first completely submerged trans-Atlantic crossing by a submarine, reached the North Pole as the second submarine to do so, and later became the first to surface there. She was decommissioned on 12 September 1986, struck from the Naval Vessel Register on 30 October 1986, and disposed of by submarine recycling at Puget Sound Naval Shipyard in 1995.

Facts
Year
1957 1
Propulsion
Nuclear 1
Status
Scrapped 1
Comparison
Body Style
Submarine 1
Connections

Of Make

Source USS Skate (SSN-578) (Wikipedia)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source USS Skate (SSN-578) (Wikipedia)Construction and commissioning, manufacturer
Quote, Construction and commissioning, manufacturer
The contract to build Skate was awarded to the Electric Boat division of General Dynamics on 18 July 1955

Originated In

Also in Geography Atlas: where this subject originated.

Source USS Skate (SSN-578) (Wikipedia)Lead
Quote, Lead
USS Skate (SSN-578), the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines.
Sources
1. USS Skate (SSN-578) (Wikipedia)
  • Construction and commissioning
    She was launched on 16 May 1957
  • Lead
    USS Skate (SSN-578), the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines.
  • Lead, propulsion
    was the lead ship of the Skate class of nuclear submarines
  • Decommissioning
    disposed of by submarine recycling at Puget Sound Naval Shipyard on 6 March 1995
  • Construction and commissioning, manufacturer
    The contract to build Skate was awarded to the Electric Boat division of General Dynamics on 18 July 1955
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.