The 6B is a small heavy-duty gas turbine, rated at about 45 MW, that General Electric first installed in 1978 and that GE Vernova still supports and sells. It was built for tough sites: it can run in island mode with no grid, has black start capability and copes with repeated start-ups, which made it a common choice for refineries, natural gas liquefaction power, combined heat and power plants and industrial sites. The maker counts more than 1,200 units installed since 1978 and more than 55 million operating hours. It burns a wide range of gases and distillate liquids, including heavy oils, naphtha, bioethanol, methanol, synthetic and steel mill gases, and standard combustion is capable of up to 100 percent hydrogen. Its exhaust gives enough heat to make industrial steam at up to 110 bar without extra firing. The first 6B went into service at the Glendive station of Montana-Dakota Utilities.

Facts
Classification
Fuel or Cycle
Natural gas 1
Year
1978 2
Connections

Of Make

Source Power Engineering: GE Celebrates 6B Turbine 40th Year with Repowering Solution
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Power Engineering: GE Celebrates 6B Turbine 40th Year with Repowering SolutionLead, maker
Quote, Lead, maker
GE’s 6B turbine fleet, which was introduced at a Montana power plant in 1978
Sources
1. 6B gas turbine (GE Vernova)
  • Specifications note, fuel
    All ratings are based on ISO conditions and natural gas fuel.
  • In Group: Heat Engines, Lead, kind of engine
    The rugged, reliable 6B heavy-duty gas turbine is a popular choice for refineries
View the Source
2. Power Engineering: GE Celebrates 6B Turbine 40th Year with Repowering Solution
Power Engineering
  • Lead, first 6B
    GE’s 6B turbine fleet, which was introduced at a Montana power plant in 1978
  • Of Make: GE Vernova, Lead, maker
    GE’s 6B turbine fleet, which was introduced at a Montana power plant in 1978
View the Source
POWER Magazine: A Brief History of GE Gas Turbines
POWER MagazineTimeline, 1978
Quote, Timeline, 1978
The first 6B machine is installed at Montana-Dakota Utilities’ Glendive station.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.

Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme