8 claims are recorded.
Bus Rapid Transit 8 claims.
Side by Side
A claim that names another entry in the atlas opens a short summary here, without leaving this comparison. The summary carries the entry's description and a button that opens its full page in a new window. Press Escape to close it.
Recorded on Bus Rapid Transit
Description1A road transit mode that combines dedicated bus lanes, signal priority, off-board fare collection and level boarding to give conventional buses much of the speed, reliability and capacity of light rail while keeping the lower construction cost and route flexibility of an ordinary bus system. The Rede Integrada de Transporte, launched in Curitiba, Brazil in 1974, is generally credited as the first true bus rapid transit network, and the model has since been adopted in more than 160 cities across six continents. Because it reuses existing road surface rather than laying new rail, a BRT corridor can typically be built far faster and cheaper than an equivalent rail line. 1Well-attested Core Concern1Giving conventional buses rail-like speed and capacity through dedicated lanes and priority infrastructure 1Well-attested Add More to This Comparison
Compare Something Else
Browse a category or search by name, and add what you find to this comparison.
Browse By Category
Every category the atlas holds, with how many entries are in it. Choosing one shows its entries right away.
Search By Name
Names and descriptions are both searched, and accents are ignored.
View At A Past Year
The atlas records no dated fact of its own for any entry in this comparison, so there is no other year to choose.
Recent Comparisons
Comparisons other visitors have made, open to look at, with no name attached to any of them.