Transport Atlas

How The World Moves
Sign In
Text size
100%
Theme
Vehicle

IAI Nesher

Military Aircraft

The IAI Nesher, Hebrew for vulture, was the first fighter produced in Israel and the aircraft that paved the way for the Kfir and the Lavi. It grew out of the Dassault Mirage 5, a daylight ground strike development of the Mirage III that Israel had ordered fifty of before France refused to deliver them under its arms embargo. Israel Aircraft Industries then secretly began building a fighter from Mirage 5 blueprints and engine drawings obtained privately, at its Ben Gurion Airport facilities. The first aircraft took to the air on 21 March 1971 and deliveries to the Israeli Air Force began in May of that year. In total 51 single-seat Nesher A and 10 two-seat Nesher B aircraft were built before production ended in 1974. The Neshers reached the height of their service in the Yom Kippur War, when they flew mainly air-to-air missions, and were phased out when the more advanced types arrived.

Facts
Year
1971 1
Significance
The Israeli version of the French Dassault Mirage 5 multirole fighter, and the first fighter produced in Israel 2
Status
Out of production 1
Status
Retired from service 1
Units Built
61 1
Comparison
Body Style
Aircraft (no road body style) 1
Connections

Exemplifies

Aviation, Modes
Source Nesher (GlobalSecurity.org)

Of Make

Source Nesher (GlobalSecurity.org)
In the Other Atlases

Manufactured By

Also in Business Atlas: the manufacturer of this subject.

Source Nesher (GlobalSecurity.org)Construction
Quote, Construction
Israel Aircraft Industries secretly began the construction of the new fighter in its Ben Gurion Airport facilities.

Originated In

Also in Geography Atlas: where this subject originated.

Source Nesher (GlobalSecurity.org)Introduction, body style
Quote, Introduction, body style
The Nesher (Vulture) was the first fighter to be produced in Israel
Sources
1. Nesher (GlobalSecurity.org)
  • Production and delivery
    On March 21st, 1971 the first aircraft took to the air and supplies to the IAF began by May of the same year.
  • Production
    In total 51 single seat Nesher A's and a further 10 double seat B's were built before production ended in 1974.
  • Production, status
    before production ended in 1974
  • Introduction
    When the better planes arrived upon the scene, the Nesher was phased out.
  • Introduction, body style
    The Nesher (Vulture) was the first fighter to be produced in Israel
  • Construction
    Israel Aircraft Industries secretly began the construction of the new fighter in its Ben Gurion Airport facilities.
  • In Group: Jet Fighters and Interceptors, Yom Kippur War
    The Neshers proved to be good fighters and overcame their adversaries
View the Source
2. IAI Nesher (Wikipedia)
Lead
Quote, Lead
is the Israeli version of the French Dassault Mirage 5 multirole fighter.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.